As the final phase of the data center expansion, the following maintenance is required to change the Data Hall main electrical panels. On 27/07/2026 from 18:00 to 22:00 (CET), the electrical panels of DataHall 2.3 (known as Technical Room 1 or CPD1) will be changed.
Start Time Window: Monday, 27.07.2025 - 18:00
End Time Window: Saturday, 27.07.2024 - 22:00
Duration: approx. 4h.
Location: bitNAP Barcelona.